2 ST Paul's PLACE - GRADE A OFFICE, SHEFFIELD
2 St Paul’s Place is a 90,000 sq. ft. speculative office development acquired by a major employer in Sheffield to locate 550 employees. The speculative office project achieved BREEAM Excellent for its fit-out.
A major 3 year long POE was undertaken in conjunction with a PhD research project on the building as part of Innovate UK funded Building Performance Evaluation study.
By the end of the POE project the process had;
-
Reduced energy consumption in the building by 27% saving £35,000 per annum.
-
Discovered a manufacturing fault on a two port fan coil controller, a fact that had escaped the manufacturer who by this time had distributed over a million defective units world wide.
-
Uncovered numerous defects in the original base build which included missing fire blankets and smoke damper control elements.
-
Uncovered numerous issues with the accuracy of the energy meter systems, including a number of meters that had not been physically connected to the data network by the constructors.
-
Uncovered and corrected numerous issues in the controls software, particularly lighting controls software.
-
Measured and fully understood, base load energy and a developed understanding of the importance of out of hours losses on items that operate on a 24 hour 7 day per week basis such as Lifts, IT, security, fire alarms and controls systems.
MORE POE CASE STUDIES
PROJECT DETAILS
Client : Available on request
Construction Value: £7 million
Date: September 2011-2014
Floor Area: 9300m2
KEY FEATURES
-
BREEAM Excellent
-
Fit-out frpm shell and core
-
Saved £35k in annual operational energy cost.
-
Identified inconsistency in controls systems
-
Winner of CIBSE Building Performance Award 2013.

Touchdown spaces